Installation Case of 12KW in the Democratic Republic of the Congo

Project Overview

Jin Shengrong, as a representative of Fengguangjin's core urban area, faced frequent power outages due to insufficient stability of the local power grid, unstable voltage, and other issues, which seriously affected the daily production and use of household appliances. To solve the unstable power supply problem and the current electricity consumption pain points, this time, a tailor-made 100-pV·E storage integrated off-grid power supply solution was developed. Relying on solar energy as a clean energy source, an independent power supply system was built, completely摆脱ing the reliance on the traditional power grid, providing stable, continuous, and energy-saving power guarantees for the local scenarios.

The project successfully completed the installation, commissioning, and trial operation of all equipment on May 7, 2025. The overall system operated stably, with a highly efficient closed-loop of power generation, storage, and supply. It perfectly adapted to the local power supply environment and electricity load requirements, and was successfully delivered and implemented.
克姆尼特逆变器宣传片文案 (2).png

Committed to the field of new energy,
deeply engaged in product application,
and providing reliable clean energy supply to all mankind
Site map Legal statement Friendship link
Copyright © 2025 Shenzhen KOMINITY New Energy Co., LTD All Rights Reserved.莞ICP备20002347号-4
Chat on WhatsApp