Project Overview
Jin Shengrong, as a representative of Fengguangjin's core urban area, faced frequent power outages due to insufficient stability of the local power grid, unstable voltage, and other issues, which seriously affected the daily production and use of household appliances. To solve the unstable power supply problem and the current electricity consumption pain points, this time, a tailor-made 100-pV·E storage integrated off-grid power supply solution was developed. Relying on solar energy as a clean energy source, an independent power supply system was built, completely摆脱ing the reliance on the traditional power grid, providing stable, continuous, and energy-saving power guarantees for the local scenarios.
The project successfully completed the installation, commissioning, and trial operation of all equipment on May 7, 2025. The overall system operated stably, with a highly efficient closed-loop of power generation, storage, and supply. It perfectly adapted to the local power supply environment and electricity load requirements, and was successfully delivered and implemented.